| | | | | |
 |
|
|
|
|
|
Issaquah High School Renovation and Addition, Issaquah
Services: Structural and Civil
Square Feet: 285,300
Construction Cost: $61,500,000
Completion: 2011
Base Materials: Steel
Client: Mahlum
Nestled in a valley, Issaquah High School will be the District’s largest school when completed. The three-story facility will accommodate 1,850 students and features three classroom wings, science labs, a main and auxiliary gym, commons, and administrative spaces. The design includes a performing arts center with a 590-seat main house, set shops, and 100-seat black box theater. To ease student travel between classes, the classroom wings are connected to each other by two-story, steel-framed sky bridges.
|
|
|